The works included supply stitch and placement of 210,000 m2 of geofabric material on an existing tailings dam. A 1.5mtr pre-load of oversized rock was then placed carefully onto the fabric. Due to tailings conditions, we were required to work multiple fronts to avoid unsuitable areas developing. A third layer of latterite was placed and compacted to provide a situation where captured water was no longer considered process water.
RAAF Base Tindal has an extensive 11 kV distribution network comprising of 11kV switchboards, underground cabling and over fifty 11 kV ring main units (RMUs)….
Design and Construction of a new facility in an existing compound directly adjacent to Building 504. The following elements included, Vehicle shelters and…
Bulk earthworks to construct large building pad. Works included, Clearing and Grubbing Development of Borrow Pits to produce general fill and pavement gravels…