Land500 Phase 1 – Remediation of Tactical Land Electronic Warfare Facilities

  • Period: 24/01/2018 – 27/07/2018
  • Client: FKG Group
  • Value: $1,120,825.65

Project Overview

Constructed the following:

  • Bulk earthworks
  • Road pavements
  • Kerbing
  • Sub-soil drainage
  • Stormwater
  • Bio retention basin
  • Sediment basin
  • Landscape works.

Challenges

  • Constructed all the infrastructure within the scope of the contract while coordinating with multiple subcontract trades to ensure that reaching milestones of the project programme were achieved.
  • Satisfied all stakeholders of the project when challenges arose regarding environmental sediment and dust control caused by continual adverse weather conditions.
  • Addressed the challenges in a proactive planned methodical way enabled productivity to be maintained.

Successes

  • No lost time injuries
  • Achieved EMP Hydraulic constraints during construction in an active stormwater system
  • Achieved all detailed elements of a complex design in consultation with designers and all stakeholders throughout the project
  • Worked with the client and multiple subcontracted trades to achieve deadlines
  • Delivered the project to the client’s expectation.

Related Projects

RMU Upgrades

RAAF Base Tindal has an extensive 11 kV distribution network comprising of 11kV switchboards, underground cabling and over fifty 11 kV ring main units (RMUs)….

Vehicle and Stores Facilities

Design and Construction of a new facility in an existing compound directly adjacent to Building 504. The following elements included, Vehicle shelters and…

Early Civil Works

Bulk earthworks to construct large building pad. Works included, Clearing and Grubbing Development of Borrow Pits to produce general fill and pavement gravels…

Have a Project in Mind?

Let’s Get Building!

Contact Us

Lot 2 Chevallum Rd, Forest Glen QLD 4556 Australia