RAAF Base Williamtown is home to No.3 Control and Reporting Unit (3CRU) who operate the Vigilare air defence system form the Eastern Region Operations Centre (EastROC). This system was installed in 2008 and fully operational by 2010. However, the main UPS system suffered from heat related reliability issues. As a result UPS2 (of 3) failed totally in 2015.
RAAF Base Tindal has an extensive 11 kV distribution network comprising of 11kV switchboards, underground cabling and over fifty 11 kV ring main units (RMUs)….
Design and Construction of a new facility in an existing compound directly adjacent to Building 504. The following elements included, Vehicle shelters and…
Bulk earthworks to construct large building pad. Works included, Clearing and Grubbing Development of Borrow Pits to produce general fill and pavement gravels…